NRF/SARAO SKA1//60/2025-26
Supply, Delivery, Installation, Testing and Commissioning of 570kVAr Reactor and Ring Main Unit (RMU) on the Existing 22kV Carnarvon Spiral, Losberg, Carnarvon (RE-ADVERTISEMENT)
Issued by National Research Foundation (NRF) · Northern Cape
Closed
Closed 30 Apr 2026 11:00
Description
Supply, Delivery, Installation, Testing and Commissioning of 570kVAr Reactor and Ring Main Unit (RMU) on the Existing 22kV Carnarvon Spiral, Losberg, Carnarvon (RE-ADVERTISEMENT)
Tender documents (24)
- pdf Annexure 14 Carnarvon spiral_ Reactor fence.pdf Open ↗
- pdf Annexure 21 SKA-TEL-SKO-0001040-02_PartB_SASiteInformation&InstructionsClean - signed.pdf Open ↗
- pdf Annexure 10 SKA-TEL-SKO-0000202-04_SKA_RFI_EMC_Standardsigned.pdf Open ↗
- pdf Annexure 7 340-020000-EF-508-R-DRG-Typical Trench Layout 1.pdf Open ↗
- pdf Annexure 4 Carnarvon REC 002 Carnarvon Spiral Reactors Overall MV Single line Diagram-Overall MV Single Line Diagram.pdf Open ↗
- pdf Annexure 2 402-000003-EE-501-DDR-REV 1 POWER Signatures Removed.pdf Open ↗
- pdf Annexure 19 Health and Safety - 570KVAR REACTOR PROJECT LOSBERG.docx (1).pdf Open ↗
- pdf Tender Advert.pdf Open ↗
- pdf Annexure 20 SKAO-TEL-SKO-0001040-02 Part A South African Site Information & Instructions clean - signed.pdf Open ↗
- pdf Annexure 5 Carnavon REC 001 Carnarvon Spiral Reactors KAPB Switchgear Single line Diagram-KAPB Switchgear room Single Line Diagram.pdf Open ↗
- pdf Annexure 16 Factory Acceptance Test (FAT).pdf Open ↗
- pdf Annexure 15 Site Acceptance Test (SAT).pdf Open ↗
- pdf Annexure 12 MV Cable support between RMU and Reactor.pdf Open ↗
- pdf Annexure 8 402-000003-DRG-EE-557-R Earthing Block Daigram.pdf Open ↗
- pdf Annexure 1 SKA-TEL_INSA-0002112 - Specification for 22kV 3.3kV and 400V Cable Network Extensions - Rev 2 - si (1).pdf Open ↗
- pdf Annexure 19 Health and Safety - 570KVAR REACTOR PROJECT LOSBERG.pdf Open ↗
- pdf Annexure 13 Signages_ On reactor fence and RMU.pdf Open ↗
- xlsx BILL OF QUANTITIES - REACTOR.xlsx Open ↗
- pdf Tender Document - Final .pdf Open ↗
- pdf Annexure 11 Equipment Technical Schedule.pdf Open ↗
- pdf Annexure 6 402-000003-EE-573-0-DRG-Thermometer Trip Wiring Schematic 1_Labels_B (4).pdf Open ↗
- pdf Annexure 9 402-000003-DRG-EE-567-R RMU and Minisub Earthing Arrangement.pdf Open ↗
- pdf Annexure 3 Carnarvon REC 003 Carnarvon Spiral Reactors Site Plan Layout-Carnarvon Spiral Reactors Site Plan Layout - A1.pdf Open ↗
- pdf Annexure 18 Environmental_Spec_Reactor_RMU_Losberg.pdf Open ↗
Documents are hosted on etenders.gov.za. Govnet links to them directly — no copies are stored.